Traduzir "ppm" para inglês

Mostrando 50 de 50 traduções da frase "ppm" de alemão para inglês

Traduções de ppm

"ppm" em alemão pode ser traduzido nas seguintes palavras/frases inglês:

ppm ppm

Tradução de alemão para inglês de ppm

alemão
inglês

DE Der SCD40 bietet eine Genauigkeit von ±(50 ppm + 5 % vom Messwert) bei 400–2000 ppm, während der SCD41 eine Genauigkeit von ±(40 ppm + 5 % vom Messwert) bei 400–5000 ppm aufweist

EN The SCD40 offers an accuracy of ±(50 ppm + 5% of reading) at 400–2000 ppm, while the SCD41 has an accuracy of ±(40 ppm + 5% of reading) at 400–5000ppm

DE Gaskonzentrationen am Boden werden in ppm (parts per million) gemessen, bei der luftgestützten Gasdetektion wird in ppm*m (parts per millionen * meter) gemessen

EN Gas concentrations on the ground are measured in ppm (parts per million), airborne gas detection is measured in ppm*m (parts per million * meter).

alemãoinglês
bodenground
ppmppm
partsparts
gemessenmeasured
inin
mm
millionenmillion
werdenare
wirdthe

DE In Unterrichtsräumen sollte die CO2-Konzentration nicht über 1000 ppm liegen – ppm (parts per million) ist die Abkürzung für die Konzentrationsangabe

EN In classrooms, the CO2 concentration should not exceed 1,000 ppm (ppm stands for “parts per million” – a measure of concentration)

DE Das CO2-Messgerät CARU air funktioniert wie eine Ampel: Zeit zu lüften ist es frühestens bei gelb (1000 – 1399 ppm CO2) und spätestens bei rot (> 1400 ppm CO2)

EN The CO2 measuring device CARU air works like a traffic light, indicating when it is time to ventilate: at the earliest, yellow (1000 - 1399 ppm CO2) and at the latest, red (> 1400 ppm CO2)

alemãoinglês
airair
zeittime
beiat
ppmppm
gtgt
istis
zuto
undand
funktioniertworks
einea
wielike
gelbyellow
frühestensearliest
esit
rotred

DE 0 bis 1000 ppm Ethanol-Äquivalente0 bis 10 ppm NO2-Äquivalente

EN 0 to 1,000 ppm of ethanol equivalents0 to 10 ppm of NO2 equivalents

alemãoinglês
ppmppm
bisof

DE Und bei zwei offenen Fenstern stabilisierte sich der Wert rasch um 500 ppm, also «parts per million», nach einem Anfangswert von 400 ppm, was der Aussenluft entspricht.

EN And with two windows open, the value quickly stabilized around 500 ppm, or parts per million, after an initial value of 400 ppm, corresponding to ambient air.

alemãoinglês
offenenopen
fensternwindows
raschquickly
ppmppm
partsparts
millionmillion
entsprichtcorresponding
undand

DE Gaskonzentrationen am Boden werden in ppm (parts per million) gemessen, bei der luftgestützten Gasdetektion wird in ppm*m (parts per millionen * meter) gemessen

EN Gas concentrations on the ground are measured in ppm (parts per million), airborne gas detection is measured in ppm*m (parts per million * meter).

alemãoinglês
bodenground
ppmppm
partsparts
gemessenmeasured
inin
mm
millionenmillion
werdenare
wirdthe

DE Und bei zwei offenen Fenstern stabilisierte sich der Wert rasch um 500 ppm, also «parts per million», nach einem Anfangswert von 400 ppm, was der Aussenluft entspricht.

EN And with two windows open, the value quickly stabilized around 500 ppm, or parts per million, after an initial value of 400 ppm, corresponding to ambient air.

alemãoinglês
offenenopen
fensternwindows
raschquickly
ppmppm
partsparts
millionmillion
entsprichtcorresponding
undand

DE Was ist Projektportfoliomanagement (PPM)?

EN What is Project Portfolio Management (PPM)?

alemãoinglês
ppmppm
istis

DE Projektportfoliomanagement (PPM) ist die zentralisierte Verwaltung aller Projekte eines Unternehmens

EN Project portfolio management (PPM) is the centralized management of an organization’s projects

alemãoinglês
ppmppm
zentralisiertecentralized
verwaltungmanagement
projekteprojects
istis

DE 0 bis 1.000 ppm von Ethanol-Äquivalenten

EN 0 to 1,000 ppm of ethanol equivalents

alemãoinglês
ppmppm
vonof

DE < 0.05 ppm von Ethanol-Äquivalenten oder < 10 % des Konzentrationssollwerts (je nachdem, welcher Wert größer ist)

EN < 0.05 ppm of ethanol equivalents or < 10 % of concentration setpoint (whichever is larger)

alemãoinglês
ppmppm
größerlarger
oderor
vonof
istis

DE Grünes Licht (< 1'000 ppm): gute Raumluftqualität, kein Handlungsbedarf

EN Green light (< 1’000 ppm): good indoor air quality, no need to action

alemãoinglês
grünesgreen
lichtlight
ppmppm
keinno
gutegood

DE Rotes Licht (> 1'600 ppm): schlechte Raumluftqualität, Lüftung auf hohem Niveau oder Öffnen aller zugänglichen Fenster

EN Red light (> 1’600 ppm): bad indoor air quality, trigger ventilation at high level or open all accessible windows

alemãoinglês
rotesred
lichtlight
ppmppm
schlechtebad
lüftungventilation
oderor
zugänglichenaccessible
fensterwindows
gtgt
aufindoor
niveauquality

DE Zum Vergleich: Draussen an der frischen Luft liegt die CO2-Konzentration bei 400 ppm

EN By way of comparison, fresh air outdoors has a CO2 concentration of 400 ppm

alemãoinglês
vergleichcomparison
frischenfresh
luftair
ppmppm
draussenoutdoors
konzentrationconcentration
liegta
derof

DE Überraschend intensiv, würzig und rauchig: Mit einem Phenolgehalt von 54 ppm im Malz ist der „Four“ nicht nur die bislang rauchigste, sondern durch die Vollreifung in Sherryfässern auch die aromatisch-kräftigste Abfüllung von St. Kilian.

EN Surprisingly intense, spicy and smoky: with a phenol content of 54 ppm in the malt, the "Four" is not only the smokiest to date, but also the most aromatic and powerful bottling of St. Kilian due to its full maturation in sherry barrels.

alemãoinglês
intensivintense
würzigspicy
ppmppm
malzmalt
aromatischaromatic
stst
kiliankilian
nichtnot
auchalso
inin
nuronly
undand
istis
vona

DE Unsere PPM Applikation macht Ihr Produktmanagement in jeder Hinsicht agil

EN Our Product Management application makes your Product Management agile in every aspect

alemãoinglês
applikationapplication
machtmakes
produktmanagementproduct management
agilagile
unsereour
ihryour
inin
jederevery

DE Eine komplette Übersicht der besten PPM-Tools

EN 10 Best PPM Tools For 2021: Comparison And Expert Reviews

alemãoinglês
ppmppm
toolstools
bestenbest
einefor
derand

DE Integrierte, digitale Lösungen für ALM, PPM, ITSM und Ihre Geschäftsprozesse

EN Integrated, digital solutions for ALM, PPM, ITSM and your business processes

alemãoinglês
integrierteintegrated
digitaledigital
lösungensolutions
almalm
ppmppm
itsmitsm
geschäftsprozessebusiness processes
ihreyour
undand
fürfor

DE Software für grundlegendes Projekt- und Ressourcenmanagement für die Aufstellung einer PPM-Disziplin durch PMOs

EN Foundational project and resource management software for PMOs establishing a PPM discipline

alemãoinglês
ressourcenmanagementresource management
pmospmos
ppmppm
disziplindiscipline
softwaresoftware
projektproject
fürfor
einera
undand

DE Mid-Tier-PPM, das den PMO- und Projekterfolg im gesamten Unternehmen beschleunigt

EN Mid-tier PPM that accelerates PMO and project success across the enterprise

alemãoinglês
beschleunigtaccelerates
ppmppm
pmopmo
undand
denthe

DE Mit modernen PPM- und Portfolioplanungstools können Sie eine höhere Agilität bei der Planung und Bereitstellung erreichen.

EN Improve agility in planning and delivery with modern PPM and portfolio planning tools.

alemãoinglês
modernenmodern
agilitätagility
planungplanning
bereitstellungdelivery
ppmppm
undand
mitwith

DE Bewältigen Sie die Herausforderungen in der sich wandelnden Arbeitswelt – ob Sie nun traditionelle oder moderne PPM-Methoden nutzen.

EN Navigate through the changing world of work – from traditional to modern PPM.

DE Geben Sie den Teammitgliedern mit der PPM-Zeiterfassung eine fokussierte Möglichkeit, sich einen Überblick über Zuweisungen zu verschaffen, Ist-Werte zu protokollieren und den Status von Projekten und Programmen zu aktualisieren.

EN Give team members a focused way to understand assignments, log their actuals, and update status tied to projects and programs with PPM time tracking.

alemãoinglês
teammitgliedernteam members
fokussiertefocused
zuweisungenassignments
protokollierenlog
statusstatus
aktualisierenupdate
ppmppm
projektenprojects
programmenprograms
gebengive
mitwith
zuto
einena
undand

DE Teams verfolgen bei der Arbeitsbereitstellung schon längst keinen einheitlichen Ansatz mehr. Die PPM-Lösungen von Planview umfassen Planview FLEX zur Unterstützung mehrerer Arbeitsmethoden – ob Wasserfall, kollaborativ oder Agile.

EN Teams no longer practice a “one-size-fits-all” work delivery process. Planview PPM solutions include Planview FLEX to support multiple work methods ? waterfall, collaborative, and Agile.

DE Verbesserung der PPM-Governance: Optimieren Sie Ihren Workflow und Ihre Gate-kontrollierten Prozesse für Projekte, Ergebnisse, Änderungen, Risiken und Probleme mit konfigurierbaren Vorlagen.

EN Improve PPM governance: Streamline your workflow and gated processes for projects, outcomes, changes, risks, and issues with configurable templates.

alemãoinglês
ergebnisseoutcomes
Änderungenchanges
konfigurierbarenconfigurable
ppmppm
governancegovernance
workflowworkflow
projekteprojects
risikenrisks
problemeissues
vorlagentemplates
prozesseprocesses
mitwith
undand
fürfor
verbesserungimprove
optimierenstreamline

DE Mit den PPM-Lösungen von Planview erhalten Sie einen umfassenden Einblick in Projektbudgets, Ist-Werte und Prognosen und können so Kosten nach Innovation, Compliance und Wartung aufschlüsseln.

EN Planview’s PPM solutions provide comprehensive views into project budget, actuals, and forecasts to understand how costs break down by innovation, compliance, and “keep the lights on.”

alemãoinglês
umfassendencomprehensive
prognosenforecasts
innovationinnovation
compliancecompliance
aufschlüsselnbreak down
kostencosts
einblickproject
into
denthe

DE Planview kann Ihnen auf dem Weg zu mehr Agilität beratend zur Seite stehen. Erstellen Sie einen Plan zur Modernisierung des PPM auf vier wichtigen Ebenen.

EN Planview can be your guide as you navigate your journey toward greater agility. Create your plan to modernize PPM along four key dimensions.

alemãoinglês
planviewplanview
agilitätagility
ppmppm
wichtigenkey
planplan
kanncan
zuto
erstellencreate
sieyou
vierfour

DE Die Einführung neuer Arbeitsweisen und die kontinuierliche Ausrichtung der Arbeit am Portfolio stehen im Zentrum des modernen PPM.

EN Core to modern PPM is embracing new ways of working and keeping the work aligned back to the portfolio.

alemãoinglês
portfolioportfolio
ppmppm
modernenmodern
neuernew
arbeitsweisenwork
undand
stehento

DE Eine Plattform für das moderne PPM: Ein Portfolio + mehrere Arbeitsweisen

EN A Platform for Modern PPM – One Portfolio + Multiple Ways of Working

alemãoinglês
plattformplatform
modernemodern
ppmppm
portfolioportfolio
arbeitsweisenworking
mehreremultiple
fürfor
eina

DE Tools für das Projekt-Portfoliomanagement wie Planview Enterprise One und Planview PPM Pro für herkömmliche Wasserfallprojekte

EN Project portfolio management tools like Planview Enterprise One and Planview PPM Pro for traditional waterfall projects

alemãoinglês
toolstools
planviewplanview
ppmppm
enterpriseenterprise
projektproject
undand
fürfor
wielike
propro

DE Gemäß dem modernen PPM verlagert sich der Schwerpunkt Ihres Unternehmens von der Verwaltung der Ressourcenauslastung auf die Befähigung der Teams, Kundennutzen zu erbringen

EN Modern PPM considers that your organization’s focus will shift from managing resource utilization to enabling teams to deliver customer value

alemãoinglês
modernenmodern
ppmppm
schwerpunktfocus
ressourcenauslastungresource utilization
teamsteams
verwaltungmanaging
erbringendeliver
zuto

DE Die modernen PPM-Lösungen von Planview bieten Ihnen die Flexibilität, Kapazitäten entsprechend der Art und Vielfalt von Teams zu planen.

EN Planview’s modern PPM solutions give you the flexibility to plan capacity based on types and variety of teams.

alemãoinglês
modernenmodern
flexibilitätflexibility
kapazitätencapacity
teamsteams
ppmppm
lösungensolutions
vielfaltvariety
zuto
planenplan
undand
entsprechendbased on

DE Im modernen PPM stehen bei der Portfolioplanung nicht mehr bestimmte Projekte, sondern Ergebnisse und Vorteile im Mittelpunkt. Dies führt zur Finanzierung von Programmen, Epics oder Wertströmen.

EN In modern PPM, portfolio planning moves away from a debate about specific projects to one focused on outcomes and benefits, and leads to funding of programs, epics, or value streams.

alemãoinglês
modernenmodern
ppmppm
portfolioplanungportfolio planning
ergebnisseoutcomes
vorteilebenefits
finanzierungfunding
projekteprojects
oderor
programmenprograms
undand
führtleads
bestimmtea

DE Im modernen PPM ändern sich die Kennzahlen zur Messung des Fortschritts mit jedem Ansatz

EN In modern PPM, the actual metrics associated with measuring progress change with each approach

alemãoinglês
modernenmodern
ppmppm
ändernchange
fortschrittsprogress
ansatzapproach
kennzahlenmetrics
jedemthe

DE Erarbeiten Sie einen Plan, und erstellen Sie eine Roadmap für die Anpassung Ihres PPM-Ansatzes an Projekt-, Programm-, Agile- und Lean-Konzepte, um eine schnelle Umsetzung Ihrer Strategie zu erreichen

EN Map out a plan and create a roadmap to adapt your PPM approach across project, program, agile, and lean concepts to drive on-strategy delivery at speed

alemãoinglês
roadmaproadmap
schnellespeed
ppmppm
programmprogram
agileagile
planplan
strategiestrategy
projektproject
konzepteconcepts
ansatzesapproach
anon
zuto
dieadapt
sieout
anpassungyour
einena
erstellencreate
undand

DE Finden Sie Ihre Hybridlösung – Schaffen Sie ein Rahmenwerk für den Weg Ihres PMO zum modernen PPM

EN Find Your Hybrid – Create a Framework for Your PMO’s Journey to Modern PPM

DE Das moderne PPM positioniert Ihr PMO für eine erfolgreiche Bewältigung von Veränderungen – die Ausrichtung auf neue Prioritäten und die Anpassung an neue Arbeitsweisen. Die Experten von Planview können Ihnen helfen, Folgendes zu erreichen:

EN Modern PPM positions your PMO for success in navigating change – to both realign to shifting priorities and adapt to new ways of working. Planview experts can work with you to:

DE Mid-Tier-PPM, das den PMO- und Projekterfolg im gesamten Unternehmen beschleunigt.

EN Mid-tier PPM that accelerates PMO and project success across the enterprise.

alemãoinglês
beschleunigtaccelerates
ppmppm
pmopmo
undand
denthe

DE Planview PPM Pro erleichtert uns das Leben ungemein, da es uns eine Struktur und Konsistenz für die Herangehensweise an Projekte gibt.

EN Planview PPM Pro makes our lives so much easier, giving us structure and consistency in how we approach projects.

alemãoinglês
planviewplanview
ppmppm
lebenlives
konsistenzconsistency
gibtgiving
strukturstructure
projekteprojects
dasapproach
undand
propro
unsus

DE Wir haben Projektverzögerungen um 92 Prozent reduziert und die Anzahl der Projekte, die wir erfolgreich abschließen können, um 50 Prozent erhöht. Ohne PPM Pro hätten wir das nicht geschafft.

EN We have reduced project delays by 92% and increased the number of projects we can deliver by 50%. We couldn’t have done it without PPM Pro.

alemãoinglês
reduziertreduced
ppmppm
geschafftdone
könnencan
projekteprojects
wirwe
ohnewithout
undand
abschließenthe
habenhave
dieincreased
anzahlnumber of
propro

DE Erweitern Sie Ihre PPM-Erfahrung und werden Sie zum Experten

EN Get savvy and evolve your PPM maturity beyond the basics

alemãoinglês
werdenget
erweiternevolve
ppmppm
undand
ihreyour
zumthe

DE Die besten PPM-Tools von Planview für jedes PMO ... und mehr!

EN Planview Top PPM Tools for Every PMO? and More!

alemãoinglês
planviewplanview
pmopmo
ppmppm
toolstools
mehrmore
fürfor
undand

DE Die IT PPM-Software von Planview verbessert Ihre PMO-Praktiken, sodass Sie ein Portfolio mit höherem strategischen Nutzen liefern können. Beispielsweise sind Sie zu Folgendem in der Lage:

EN Planview’s IT PPM software elevates your PMO practices to deliver a portfolio with higher strategic value by:

alemãoinglês
portfolioportfolio
höheremhigher
strategischenstrategic
ppmppm
pmopmo
itit
softwaresoftware
praktikenpractices
lieferndeliver
ihreyour
mitwith
folgendema

DE Sie treiben das PPM im gesamten Unternehmen voran, um unternehmensweit Governance, Change Management, Transparenz und strategische Entscheidungen zu fördern

EN EPMOs drive PPM at scale across the business for enterprise-wide governance, change management, visibility, and strategic decision-making

alemãoinglês
ppmppm
transparenzvisibility
strategischestrategic
entscheidungendecision
governancegovernance
changechange
managementmanagement
umfor
undand
unternehmenbusiness
voranthe
gesamtenat
förderndrive

DE Mit Enterprise-PPM-Software können Sie die abteilungsübergreifende Programm- und Projektbereitstellung planen und verwalten, die für das Erreichen wichtiger strategischer Ziele unerlässlich ist.

EN Enterprise PPM software lets you plan and manage cross-departmental program and project delivery essential to achieving key strategic objectives.

alemãoinglês
strategischerstrategic
ppmppm
enterpriseenterprise
softwaresoftware
programmprogram
verwaltenmanage
zieleobjectives
planenplan
sieyou
unerlässlichessential
undand
wichtigerkey
istlets
mitachieving

DE Enterprise-Workmanagement für das PPM und Teams für die Bereitstellung professioneller Dienste

EN Enterprise work management for PPM and professional services delivery teams

alemãoinglês
ppmppm
bereitstellungdelivery
teamsteams
diensteservices
enterpriseenterprise
professionellerprofessional
fürfor
undand

DE Unternehmensweites Work-Management mit PPM- und Projektumsetzungsfunktionen

EN Enterprise work management that advances PPM and project delivery capabilities

alemãoinglês
workwork
ppmppm
managementmanagement
undand

DE Planview Clarizen: Work-Management-Software für PPM und PSA in Unternehmen

EN Planview Clarizen: Enterprise work management software for PPM and PSA

alemãoinglês
planviewplanview
ppmppm
softwaresoftware
psapsa
managementmanagement
workwork
undand
fürfor
unternehmenenterprise

DE mit der PPM-Software Daptiv von Planview

EN with Planview Daptiv PPM software

alemãoinglês
planviewplanview
ppmppm
softwaresoftware
mitwith

Mostrando 50 de 50 traduções